Hardware Installation (Week 10)

All the equipment needs in this project was fitted.  From the electrical circuit, mechanical control, pipeline, turbine and alternator.
Pipeline Installation

Up view

Side view

Front view done with turbine and alternator


Actuator to control the valve

Pressure Gauge to determine water flow in pipeline

Thursday, 22 March 2012

Testing Circuit (Week 9)

Do the testing on the circuit without load.  Try and error and do some calibration at the circuit and programming.


Circuit in the box

PIC circuit, Relay circuit and Sensor circuit

DC power supply

Test run the programme

Calibration program and hardware

Thursday, 15 March 2012

Etching & Soldering (Week 8)

On this week, all process etching and soldering has been done because due to the project timeline it should be clear before week 9

Designing the circuit by using protell software

Etching process

Cleaning and drying process

Made a hole at this circuit

Done

Done the all etching process

Thursday, 1 March 2012

Programming by using MPLAB IDE v8.50 (Week 7)

On this week, I create the program for this project by using MPLAB IDE v8.50.  Assembly language was choose because it quiet easy to write the program.



More programming on my report