Thursday, 31 May 2012

Final Report (Week 15-16)

Complete the final report, technical paper and upload all the submission for degree fyp 2 at rps.
Finally done. Alhamdulillah

Tuesday, 24 April 2012

Thursday, 19 April 2012

Final preparation & Touch-Up (Week 13)


After complete working on software and hardware, I have do some prepareration on my poster.It will use on presentation day. The objective by doing this prepare ration is to get prepared the answer for the question that asked by lecturer.  Ready to the killer question from the accessors.

Ready in action

Front view
 

Thursday, 12 April 2012

Poster (Week 12)

Design and making a poster to prepare during the presentation day.
Poster of Micro Hydro

Thursday, 5 April 2012

Test run actual system (Week 11)

Due to the presentation date, on this week all system should be test and maybe need some calibration at sensor or valve to give full efficiency at this project.



Actual system

Whole system

Battery connection

Alternator connection

Alternator indicator lamp connection

Nozzle

Turbine

Thursday, 29 March 2012

Hardware Installation (Week 10)

All the equipment needs in this project was fitted.  From the electrical circuit, mechanical control, pipeline, turbine and alternator.
Pipeline Installation

Up view

Side view

Front view done with turbine and alternator


Actuator to control the valve

Pressure Gauge to determine water flow in pipeline

Thursday, 22 March 2012

Testing Circuit (Week 9)

Do the testing on the circuit without load.  Try and error and do some calibration at the circuit and programming.


Circuit in the box

PIC circuit, Relay circuit and Sensor circuit

DC power supply

Test run the programme

Calibration program and hardware

Thursday, 15 March 2012

Etching & Soldering (Week 8)

On this week, all process etching and soldering has been done because due to the project timeline it should be clear before week 9

Designing the circuit by using protell software

Etching process

Cleaning and drying process

Made a hole at this circuit

Done

Done the all etching process

Thursday, 1 March 2012

Programming by using MPLAB IDE v8.50 (Week 7)

On this week, I create the program for this project by using MPLAB IDE v8.50.  Assembly language was choose because it quiet easy to write the program.



More programming on my report

Thursday, 23 February 2012

PCB Circuit (Week 6)

Create and do some testing circuit on Proteus software. Refer on picture below:


Circuit Diagram

Thursday, 16 February 2012

LCD Display (Week 5)

Study and research about 16 x 2 Character LCD. This LCD will use on my circuit. It will display the voltage, current and watt value.Go to this link to get the datasheet of  16 x 2 Character LCD.


http://www.dfrobot.com/image/data/FIT0127/datasheet.pdf

Soldering iorn process

Thursday, 9 February 2012

PIC16F788A Configure (Week 4)

Study about PIC16F788A microcontroller from the datasheet.  Get the  PIC16F788A microcontroller from online market.  Go to this link to get the datasheet of PIC16F788A microcontroller.  

http://ww1.microchip.com/downloads/en/devicedoc/30292c.pdf

Actual of PIC16F877A


PIC16F877A Pin Terminals

Thursday, 2 February 2012

Discuss with advisor about prototype (Week 3)

On this week, i have do some discussion with my advisor about prototype. The advisor explain what are need on the prototype. Need to be done on two week after discussion



Thursday, 26 January 2012

Finding a suitable components for the circuit (Week 2)

On this week, I do some research about the suitable components for the circuit.  Finding the best components about the value of current capacity, resistance, availabilities and the price of the components.


Thursday, 19 January 2012

My new chapter on FYP (Week 1)

Assalamualaikum.  How are you today?  For the first week of my final year project, my advisor asked me to make a plan for my final year project and it called a Timeline. The plan consist of thing that i plan to do such as search circuit or hardware, make a simulation and etc in 14 weeks. I planned it by using Microsoft Project.. and this is the Timeline.