Thursday, 31 May 2012

Final Report (Week 15-16)

Complete the final report, technical paper and upload all the submission for degree fyp 2 at rps.
Finally done. Alhamdulillah

Tuesday, 24 April 2012

Thursday, 19 April 2012

Final preparation & Touch-Up (Week 13)


After complete working on software and hardware, I have do some prepareration on my poster.It will use on presentation day. The objective by doing this prepare ration is to get prepared the answer for the question that asked by lecturer.  Ready to the killer question from the accessors.

Ready in action

Front view
 

Thursday, 12 April 2012

Poster (Week 12)

Design and making a poster to prepare during the presentation day.
Poster of Micro Hydro

Thursday, 5 April 2012

Test run actual system (Week 11)

Due to the presentation date, on this week all system should be test and maybe need some calibration at sensor or valve to give full efficiency at this project.



Actual system

Whole system

Battery connection

Alternator connection

Alternator indicator lamp connection

Nozzle

Turbine

Thursday, 29 March 2012

Hardware Installation (Week 10)

All the equipment needs in this project was fitted.  From the electrical circuit, mechanical control, pipeline, turbine and alternator.
Pipeline Installation

Up view

Side view

Front view done with turbine and alternator


Actuator to control the valve

Pressure Gauge to determine water flow in pipeline

Thursday, 22 March 2012

Testing Circuit (Week 9)

Do the testing on the circuit without load.  Try and error and do some calibration at the circuit and programming.


Circuit in the box

PIC circuit, Relay circuit and Sensor circuit

DC power supply

Test run the programme

Calibration program and hardware